For a flat · separate toilet

Toilet with a concealed frame

In a separate toilet room, a wall-hung toilet on a concealed frame replaces the old toilet and cistern. The floor beneath stays clear, the cistern sits inside the wall, and we lay a new waste branch to the stack.

Schematic cutaway of a narrow toilet room with the false wall opened. Red shows the concealed frame with its cistern, the water pipe with a valve and the waste branch; grey shows the wall-hung toilet, the flush plate, the cast-iron stack and the hatch.
A schematic picture, not a drawing of a particular home. Red shows the new work.
Who it is for
Flats with a separate toilet where the old toilet or cistern leaks, or where you simply want more room.
Which homes
  • Series 103 two- and three-room flats
  • Series 602
  • Series 467 two-room flats
  • Series 119
  • Brezhnev-era brick blocks of the 1960s–70s

What we replace and improve

The numbers in the picture match the numbers in the list.

We do it
Our own technicians, our own work.
We do it — with consent
We do the work ourselves, but first the building manager, the owners or the water utility must agree. We tell you how to arrange it.
Another specialist — we help find one
Another specialist does this. We say so plainly and help you find who does it.
  1. Frame with cistern

    We do it

    A steel frame that carries the toilet, with the cistern inside the wall. We fix the frame to the wall and floor.

  2. Wall-hung toilet

    We do it

    The toilet hangs on the frame; the floor beneath it stays clear.

  3. Flush plate

    We do it

    The cistern valves can be reached through the flush plate opening, so a leaking cistern doesn't mean opening the wall.

  4. Water supply with a valve

    We do it

    A new pipe to the cistern with its own shut-off valve.

  5. Waste branch Ø110

    We do it

    A new branch from the toilet to the stack.

  6. Stack and hatch

    We do it — with consent

    The stack is the building's common property. If the cast-iron stack is in poor condition, we replace it with the owners' decision. The hatch stays so the stack can be reached.

  7. False wall and tiles

    Another specialist — we help find one

    The frame is closed in with moisture-resistant plasterboard and tiled. A finishing contractor does this; we plan the order of work with them.

How it goes

Who does what at each step.

  1. 01A.B.A.

    Site visit

    We check the room's size, the stack and whether a frame fits.

  2. 02Building manager

    Water shut-off

    If we connect to the riser, the building manager arranges the shut-off.

  3. 03A.B.A.

    Removal and frame

    We take out the old toilet and cistern, install the water and waste connections and fit the frame.

  4. 04Finishing contractor

    False wall and tiles

    The finishing contractor closes in the frame and tiles it; the hatch at the stack stays open to reach.

  5. 05A.B.A.

    Toilet and flush plate

    We hang the toilet, fit the flush plate and check the flush and the seals.

  6. 06A.B.A.

    Handover

    We show you where the shut-off valve is and how to reach the cistern valves.

Three scope options

The options differ in scope, not in price. We name the price after a site visit, in a written estimate.

  • Basic

    • Frame with cistern and a wall-hung toilet
    • Water supply with a shut-off valve

    Price — after a site visit

  • Standard

    • Everything in Basic
    • New waste branch to the stack
    • Hatch at the stack
    • Order of work planned with the finishing contractor

    Price — after a site visit

  • Plus

    • Everything in Standard
    • The stack section in the toilet, with the building's decision
    • A small corner basin, if there is room

    Price — after a site visit

What you arrange

  • Choosing the toilet and flush plate
  • The water shut-off, arranged by the building manager
  • If the stack is replaced, the building's decision
  • A finishing contractor for the false wall and tiles; we can help you find one

What we don't do and what can change the scope

  • Whether a frame fits, we can say only after measuring; toilet rooms differ
  • If the stack turns out to be damaged, the scope can change; we agree it before the work
  • The hatch at the stack must stay reachable; it is not tiled over
  • A finishing contractor does the false wall and tiles

What the rules say

Short and plain, with each rule's name and number so you can check it yourself.

  • Apartment Ownership Law, Section 3(2)(2) and (3): the toilet and the pipes up to the stack are yours; the stack is the building's common property.

  • Apartment Ownership Law, Section 11: work inside your own flat needs no consent unless it affects common property or another flat.

  • Building Regulations (Cabinet Regulation No. 529) and Liepāja building authority guidance: replacing fixtures in the same places needs no construction documents.

Questions

Will a frame fit in my toilet?

We can tell after measuring: what matters is the depth of the room and where the stack is. Frames come in different sizes.

What if the built-in cistern starts to leak?

The cistern valves are reached through the flush plate opening, so the wall stays closed. Call us and we'll come.

Is a wall-hung toilet strong enough?

Yes, if the frame is properly fixed to the wall and floor. The frame carries the weight, not the wall.

Do I need the building authority?

No, if the toilet stays in the same place and you don't change partition walls. If you change partitions or join the toilet with the bathroom, you need a construction notice in BIS prepared by a certified architect.

Toilet with a concealed frame

Tell us about your home

Call us or describe the situation in the form: the address, the building series or type, the floor and, if you have them, photos. We come, take a look and prepare a written estimate.

Call · 24/7+371 277 66 340
Fill in the request

In the form, choose “Plumbing repair” and name this project in your message.

Related service: Plumbing works

Other projects

All projects
Call 24/7 · 277 66 340Request