For an apartment building · managers and associations
Riser replacement for a whole stairwell
In Soviet-era blocks the steel water risers and cast-iron sewer stacks have served for decades. We replace them for the whole stairwell, from the shut-off valves in the basement to the vent above the roof, with the owners' decision and a schedule set by the building manager.

- Who it is for
- Owners' associations, building managers and house representatives whose risers have started to leak or clog.
- Which homes
- Series 103, 104, 119, 467 and 602
- Series 316 and 318 (Khrushchev-era blocks)
- Lithuanian-project blocks
- Other buildings with old cast-iron and steel risers
What we replace and improve
The numbers in the picture match the numbers in the list.
- We do it
- Our own technicians, our own work.
- We do it — with consent
- We do the work ourselves, but first the building manager, the owners or the water utility must agree. We tell you how to arrange it.
- Another specialist — we help find one
- Another specialist does this. We say so plainly and help you find who does it.
Sewer stack Ø110
We do itA new sewer stack on every floor in place of the old cast iron.
Water risers
We do itNew cold-water, hot-water and circulation risers.
Branches with shut-off valves
We do itIn each flat, a branch from the riser with a shut-off valve, as the building code requires.
Towel rails with a bypass
We do itWe connect the towel rails to the hot-water riser with a bypass, so circulation never stops.
Shut-off valves in the basement
We do itA shut-off valve at the foot of each riser, so in an emergency one riser can be shut off instead of the whole building.
Basement mains
We do itIn the Plus option we also replace the horizontal mains in the basement.
Vent above the roof
We do itThe sewer stack continues above the roof as a vent pipe.
Floor slab crossings
We do itWe replace the riser where it passes through the floor slab too, which is where old pipes rust first, and seal the crossing.
How it goes
Who does what at each step.
01A.B.A.
Survey
We look at the risers in the basement and the flats, assess their condition and take photos.
02A.B.A.
Written estimate
We prepare an estimate for the stairwell or the whole building that can be put before the owners' meeting.
03The owners together
Owners' decision
The owners decide on the replacement. The decision binds every owner, including those who voted against.
04Building manager
Schedule
The building manager arranges the water shut-offs and tells the residents. Every flat knows when we will come.
05A.B.A.
Floor by floor
We remove the old pipes, install the new ones with branches and valves, and seal the slab crossings.
06A.B.A.
Pressure test
We pressure-test the water pipes before they go into use.
07A.B.A.
Handover
We hand the work over to the building manager and show the new shut-off valves.
Three scope options
The options differ in scope, not in price. We name the price after a site visit, in a written estimate.
Basic
- Water risers or the sewer stack
- Branches with shut-off valves in every flat
Price — after a site visit
Standard
- Cold, hot and circulation risers plus the sewer stack
- Shut-off valves in every flat and at the foot of each riser
- Towel rails with a bypass
Price — after a site visit
Plus
- Everything in Standard
- Basement mains
- Room for meters for unified metering (see the meter project)
Price — after a site visit
What you arrange
- The owners' decision and its minutes
- Telling the residents, usually done by the building manager
- Access to every flat on the schedule
- The decision should say who restores the tiles and boxing around the risers in the flats
- Belongings and furniture moved away from the risers
What we don't do and what can change the scope
- The building manager or association drafts the decision; we provide the estimate and explain the scope
- If the risers are tiled in, the boxing must be opened; the decision says who restores the finish
- If an owner refuses access, work on that riser stops, even though the decision obliges them to give it
- Sections replaced earlier without approval may need extra work
What the rules say
Short and plain, with each rule's name and number so you can check it yourself.
Apartment Ownership Law, Section 16: the owners together decide on common property; the risers are the building's common property.
Apartment Ownership Law, Section 10(1)(7): every owner must give access for work on common property.
LBN 221-15 (Cabinet Regulation No. 332): point 118.5, shut-off valves on the risers in buildings of three or more storeys; point 118.8, a shut-off valve at each flat's inlet; point 139, one branch from each riser per flat, each with a meter.
Questions
What if an owner refuses access?
Who pays for restoring the tiles in the flats?
How long will we be without water?
Can I replace the riser only in my flat?
Do you help prepare the decision?
Riser replacement for a whole stairwell
Tell us about your home
Call us or describe the situation in the form: the address, the building series or type, the floor and, if you have them, photos. We come, take a look and prepare a written estimate.
In the form, choose “Reconstruction” and name this project in your message.
Related service: System reconstruction
Other projects
All projects
Meter assembly and unified metering
What changes in water metering from 2027, what is required and what isn't, and what a proper meter assembly looks like.

Bathroom in a series-built flat
New pipes from the riser to every tap, new waste pipes, a towel rail and fixtures, in a flat with a separate bathroom and toilet.

Small combined bathroom: a shower instead of the bath
A shower instead of the bath, a wall-hung toilet and room for a washing machine, in a small bathroom that is also the toilet.