For an apartment building · by 1 January 2027

Meter assembly and unified metering

Since 6 June 2025 flat water meters no longer need re-verification, and a working meter may stay. By 1 January 2027 the owners decide on unified metering. We tell you honestly what is required and what isn't, and we install meter assemblies if the building decides so.

Schematic cutaway of an opened service niche with cold and hot water risers. Red shows the ball valves, strainers, meters with a radio module and non-return valves; grey shows the risers and the hatch door.
A schematic picture, not a drawing of a particular home. Red shows the new work.
Who it is for
Building managers, owners' associations and flat owners who want to understand what needs doing by 2027.
Which homes
  • Apartment buildings with water meters in the flats
  • Buildings where the meters are of different kinds or hard to reach

What we replace and improve

The numbers in the picture match the numbers in the list.

We do it
Our own technicians, our own work.
We do it — with consent
We do the work ourselves, but first the building manager, the owners or the water utility must agree. We tell you how to arrange it.
Another specialist — we help find one
Another specialist does this. We say so plainly and help you find who does it.
  1. Ball valve

    We do it

    A shut-off valve before the meter, so it can be replaced without shutting off the riser.

  2. Strainer

    We do it

    A coarse strainer before the meter catches the sand and rust that damage it.

  3. Meter

    We do it

    Once the building has unified metering, a meter is replaced when the manufacturer's service life ends, or 10 years after installation if the manufacturer gives none.

  4. Radio module

    We do it — with consent

    Remote reading isn't a legal requirement. Reading is usually a paid service, and the building decides on it.

  5. Non-return valve

    We do it

    A non-return valve after the meter stops water flowing back.

  6. Hatch

    The meters must be reachable for reading and replacement. If there is no hatch or it is too small, the scope can change.

How it goes

Who does what at each step.

  1. 01A.B.A.

    Inventory

    We visit the flats and list what meters there are, where they are and whether they can be reached.

  2. 02Building manager

    The building manager's assessment

    The building manager prepares an assessment, including of remote-read meters; the owners consider it when they decide.

  3. 03The owners together

    The owners' decision

    The owners decide by 1 January 2027. The building manager cannot decide it alone.

  4. 04A.B.A.

    Installation

    We install the meter assemblies according to the decision and the schedule.

  5. 05A.B.A.

    Starting readings

    We record the starting readings and pass them to the building manager.

  6. 06You

    Reading

    You submit the readings every month or they are read remotely, as the building's decision says.

Three scope options

The options differ in scope, not in price. We name the price after a site visit, in a written estimate.

  • Basic

    • Replacing the meter in one flat
    • Ball valve and strainer

    Price — after a site visit

  • Standard

    • A full assembly: valve, strainer, meter and non-return valve
    • For the whole building after the owners' decision

    Price — after a site visit

  • Plus

    • Everything in Standard
    • Meters with radio modules, if the building decides so
    • Hatches or moving meters to a reachable place

    Price — after a site visit

What you arrange

  • The owners' decision on unified metering
  • Access to the meters in every flat
  • Submitting readings to the building manager
  • If you choose remote reading, a contract with the service provider

What we don't do and what can change the scope

  • We don't sell flat-meter verification; it is no longer needed
  • The building's inlet meter belongs to the water utility
  • The owners decide on unified metering, not us
  • The service provider sets the reading fee
  • If a meter is hard to reach or there is no hatch, the scope can change

What the rules say

Short and plain, with each rule's name and number so you can check it yourself.

  • Cabinet Regulation No. 329 of 3 June 2025: since 6 June 2025 flat water meters need no re-verification.

  • Cabinet Regulation No. 1013 of 9 December 2008 (as amended): point 14.1, the owners set the procedure for unified metering and the building manager arranges installing and replacing the meters; point 40, the owners decide on unified metering by 1 January 2027, considering the manager's assessment of remote-read meters; point 14.2, a meter is replaced after the manufacturer's service life or 10 years after installation; point 19.1, an owner who refuses access or a meter is billed for water differently from the others; point 27, readings are submitted monthly or read remotely.

  • Remote reading isn't a legal requirement; the building decides on it.

Questions

Do the meters have to be replaced by 2027?

Not necessarily. By 1 January 2027 the owners decide on unified metering. If the building introduces it, meters are replaced according to the decision; a working meter may stay if it fits the decision.

Do the meters still need verifying?

No. Since 6 June 2025 flat water meters need no re-verification. The building manager or the owners may ask for a check if a meter reads wrongly or is damaged.

Is remote reading compulsory?

No. It isn't a legal requirement. Reading is usually a paid service, and the building decides on it.

What if a neighbour refuses to replace their meter?

The owners' decision binds everyone. An owner who refuses access or a meter is billed for water differently from the others (Cabinet Regulation No. 1013, point 19.1). The building manager handles it.

Can the building manager decide alone?

No. The building manager assesses and prepares a proposal, but the owners make the decision on unified metering.

Meter assembly and unified metering

Tell us about your home

Call us or describe the situation in the form: the address, the building series or type, the floor and, if you have them, photos. We come, take a look and prepare a written estimate.

Call · 24/7+371 277 66 340
Fill in the request

In the form, choose “Meter replacement” and name this project in your message.

Related service: Meter replacement

Other projects

All projects
Call 24/7 · 277 66 340Request