For an apartment building · by 1 January 2027
Meter assembly and unified metering
Since 6 June 2025 flat water meters no longer need re-verification, and a working meter may stay. By 1 January 2027 the owners decide on unified metering. We tell you honestly what is required and what isn't, and we install meter assemblies if the building decides so.

- Who it is for
- Building managers, owners' associations and flat owners who want to understand what needs doing by 2027.
- Which homes
- Apartment buildings with water meters in the flats
- Buildings where the meters are of different kinds or hard to reach
What we replace and improve
The numbers in the picture match the numbers in the list.
- We do it
- Our own technicians, our own work.
- We do it — with consent
- We do the work ourselves, but first the building manager, the owners or the water utility must agree. We tell you how to arrange it.
- Another specialist — we help find one
- Another specialist does this. We say so plainly and help you find who does it.
Ball valve
We do itA shut-off valve before the meter, so it can be replaced without shutting off the riser.
Strainer
We do itA coarse strainer before the meter catches the sand and rust that damage it.
Meter
We do itOnce the building has unified metering, a meter is replaced when the manufacturer's service life ends, or 10 years after installation if the manufacturer gives none.
Radio module
We do it — with consentRemote reading isn't a legal requirement. Reading is usually a paid service, and the building decides on it.
Non-return valve
We do itA non-return valve after the meter stops water flowing back.
Hatch
The meters must be reachable for reading and replacement. If there is no hatch or it is too small, the scope can change.
How it goes
Who does what at each step.
01A.B.A.
Inventory
We visit the flats and list what meters there are, where they are and whether they can be reached.
02Building manager
The building manager's assessment
The building manager prepares an assessment, including of remote-read meters; the owners consider it when they decide.
03The owners together
The owners' decision
The owners decide by 1 January 2027. The building manager cannot decide it alone.
04A.B.A.
Installation
We install the meter assemblies according to the decision and the schedule.
05A.B.A.
Starting readings
We record the starting readings and pass them to the building manager.
06You
Reading
You submit the readings every month or they are read remotely, as the building's decision says.
Three scope options
The options differ in scope, not in price. We name the price after a site visit, in a written estimate.
Basic
- Replacing the meter in one flat
- Ball valve and strainer
Price — after a site visit
Standard
- A full assembly: valve, strainer, meter and non-return valve
- For the whole building after the owners' decision
Price — after a site visit
Plus
- Everything in Standard
- Meters with radio modules, if the building decides so
- Hatches or moving meters to a reachable place
Price — after a site visit
What you arrange
- The owners' decision on unified metering
- Access to the meters in every flat
- Submitting readings to the building manager
- If you choose remote reading, a contract with the service provider
What we don't do and what can change the scope
- We don't sell flat-meter verification; it is no longer needed
- The building's inlet meter belongs to the water utility
- The owners decide on unified metering, not us
- The service provider sets the reading fee
- If a meter is hard to reach or there is no hatch, the scope can change
What the rules say
Short and plain, with each rule's name and number so you can check it yourself.
Cabinet Regulation No. 329 of 3 June 2025: since 6 June 2025 flat water meters need no re-verification.
Cabinet Regulation No. 1013 of 9 December 2008 (as amended): point 14.1, the owners set the procedure for unified metering and the building manager arranges installing and replacing the meters; point 40, the owners decide on unified metering by 1 January 2027, considering the manager's assessment of remote-read meters; point 14.2, a meter is replaced after the manufacturer's service life or 10 years after installation; point 19.1, an owner who refuses access or a meter is billed for water differently from the others; point 27, readings are submitted monthly or read remotely.
Remote reading isn't a legal requirement; the building decides on it.
Questions
Do the meters have to be replaced by 2027?
Do the meters still need verifying?
Is remote reading compulsory?
What if a neighbour refuses to replace their meter?
Can the building manager decide alone?
Meter assembly and unified metering
Tell us about your home
Call us or describe the situation in the form: the address, the building series or type, the floor and, if you have them, photos. We come, take a look and prepare a written estimate.
In the form, choose “Meter replacement” and name this project in your message.
Related service: Meter replacement
Other projects
All projects
Riser replacement for a whole stairwell
New water and sewer risers from the basement to the roof, with the owners' decision and a flat-by-flat schedule.

Bathroom in a series-built flat
New pipes from the riser to every tap, new waste pipes, a towel rail and fixtures, in a flat with a separate bathroom and toilet.

Small combined bathroom: a shower instead of the bath
A shower instead of the bath, a wall-hung toilet and room for a washing machine, in a small bathroom that is also the toilet.